Project: Large Grocery Distribution Warehouse
Location: Orlando, FL
Completion Date: Fall 2014
Quick Facts: 180,000 Sq.Yds
Preferred Materials provided 180,000 square yards (40,000 tons) of asphalt pavement, work for Whiting-Turner and the Briar Team. The paving was done for a large grocery distribution center based out of Orlando, FL. The overall project completed in Fall 2014.
The Arlington is a new luxury resort-style continuing care retirement community which required Preferred Materials to provide 25,000 cubic yards of concrete and a wide array of structural concrete mix designs.
In mid-October 2014, Preferred Materials, Inc. began a 4-mile resurfacing project of Pelican Bay Blvd. in Naples, FL.
Preferred Materials, Inc recently supplied over 6000 cubic yards of our specialty product DrainReady for use in the beach parking lots on Siesta Key.