Location: Fort Walton, FL
Company: Robins and Morton
Completion Date: July 2017
The Preferred Materials Concrete Division completed a Hilton Garden Inn hotel in Fort Walton Beach, FL. The 8,000 cubic yards of concrete that was needed for this project varied between different concrete designs ranging from 3,000psi and 6,000psi. Robins and Morton began the hotel in February 2016 and completed the hotel in July 2017.
The Arlington is a new luxury resort-style continuing care retirement community which required Preferred Materials to provide 25,000 cubic yards of concrete and a wide array of structural concrete mix designs.
In mid-October 2014, Preferred Materials, Inc. began a 4-mile resurfacing project of Pelican Bay Blvd. in Naples, FL.
Preferred Materials, Inc recently supplied over 6000 cubic yards of our specialty product DrainReady for use in the beach parking lots on Siesta Key.